Back at the cabin, and the water works. Reassembled the filter, pumped about 100 gallons over to the main tank, and it looks like we're good to go.
Genny fired too. Looks like it was just cold enough long enough to freeze the propane line feeding the genny. Still runs like crap, but at least we have it if we need it.
Things will be in motion tomorrow, and should be getting the new roof on during the following two or three days.
No comments:
Post a Comment